Chutes and Suitability

Paper Summary

After having issues in their fuel feed chutes constantly shutting down their operation, Virginia City’s Hybrid Energy Center asked Jenike and Johanson to engineer a solution. After an onsite inspection and detailed computer modeling, practical design modifications were identified. After the redesigned chutes were installed, the chutes experienced no flow issues.

World Coal, Aug 2015.
www.worldcoal.com